Specifications


Delivery description

    Walls

  • Processed round logs with openings for all windows and doors, dovetail and joggle connections, attachment openings in balk walls, screw spars, washers and nuts, grooves in slats for installing windows and doors, detailed wall plans. Logs in following dimensions: diagonal 130, 150, 175, 200, 230 or 250 mm, Logs are from raw material.
  • All logs are rounded, numbered and impregnated with special wood protection material SINESTO B.
  • Between logs in the wall insulation material glass wool. ISOVER KH 30 – 30mm
  • Maximum permissible vertical deviation is 5cm per 1 meter
  • Floor

  • Floor board – planed wood, T&G, 28 mm.
  • Floor beams 45 x 195 mm
  • Insulation ISOVER KT 11, 200 mm
  • Underflooring - plained board 22 mm
  • Moldings.
  • Inserted Ceiling

  • Floor board – planed wood, T&G, 28 mm.
  • Beams 45 x 195 mm
  • Roof board – planed wood T&G, 20 mm.
  • Moldings.
  • Stairs

  • Pine timber open stairs.
  • Roof

  • Rafters 45 x 195 mm.
  • Roof board - plained wood T&G, 20 mm
  • Insulation ISOVER KT 11, 200 mm
  • Profiled eaves and gables
  • Ceiling board - profiled board

    Terrace and balcony

  • Floor board - plained wood, T&G, 28 mm
  • Floor beams 45 X 195
  • Round logs at the same dimensions as walls
  • Windows

  • Whole-pine timber, completely finished, windows with triple glazing packet. One side opening, on the one frame and divided by deceptive slats. K value 1,8 to 1,1
  • Moldings
  • Doors

  • Whole-pine timber doors, (outside door with glass packet). Inside doors supplied with simple lock, Outside doors without locks.
  • Moldings
  • Fixing materials

  • Nails and screws, steel bars and bolts
  • Drawings

  • Floor plan, elevation
  • Assembling instructions
  • Packing and transport

  • Timber parts will be packed in accordance with enclosed lists. Delivery to construction site on trailers. The costumer will procure a crane or a lift for unloading
  • Delivery and payments

  • Delivery time 4 weeks after signing the contract.
  • Payment in 2 - 4 steps (3%, 50%, 37%, 10%)